PETRA Reviews Water Supply Projects in Labuan

Estimate Reading Time: < 1 minute

LABUAN, 16 November 2026 (The Capital Post) – The Ministry of Energy Transition and Water Transformation (PETRA) has reviewed ongoing water supply and sewerage projects in Labuan as part of efforts to strengthen infrastructure and ensure sustainable water services for residents.

PETRA Deputy Secretary-General (Water), Datuk Mohd Rodzwan Mohd Baba Sakri, chaired a meeting and conducted a working visit to the Labuan Federal Territory Water Supply Department from November 11 to 12.

The meeting focused on the implementation status of ongoing projects and short-, medium- and long-term planning for water supply and sewerage services in the federal territory.

Among those present were Federal Territories Department Director-General Datuk Muhammad Azmi Mohd Zain, NAHRIM Director-General Ir. Ts. Gs. Dr Safari Mat Desa and Labuan Corporation Chief Executive Officer Haji Rithuan Haji Mohd Ismail.

Also attending were Water Supply Department Deputy Director-General Ir. Che Zabidi Che Ani, alongside representatives from the Sewerage Services Department (JPP) and the National Water Services Commission (SPAN).

-Advertisement-

The delegation inspected the ongoing project to upgrade the water distribution piping system and related infrastructure at Kampung Bebuloh Laut.

Officials also visited the project to upgrade the raw water pipeline system connecting Bukit Kuda Dam to the Jalan Kolam Water Treatment Plant in Labuan.

According to a post on PETRA’s official Facebook page, the site visits were aimed at assessing project progress and ensuring the long-term sustainability of water infrastructure.

The ministry said the initiatives were intended to support a reliable and sustainable water supply for the well-being of Labuan residents.– The Capital Post